Thursday, December 26, 2013

Project 8-Performance

Our final project for semester 1 was performance night.The theme for our performance night was "Lost Kingdom". Building technology got Mataram Kingdom. Actually i don't understand the "Lost Kingdom" theme. But what i know is that moments is the best moment that i'd been through.

Building technology Family during the performance night

HBP family during that night. We're awesome! 




Wednesday, December 25, 2013

Project 7-Xzbition Day

Our studio work continue with the Xzbition day for all 7 majors. In this project,i was happened to be the group leader for Building Technology team. For me,its my new experience to handle this big event with my coursemate.


Our booth location before the renovation.


during the decoration time

Spiral decoration in our booth.


Our Final Product of Project 6

Finally,these are our results. For me,its worth it for us.






Construction Week of Project 6

After completed our presentation boards,the most stressful moment comes to the construction team...

Our floor frame and structure frame completed. Phase 1 stresss released. phheeww



Aaaaaaaaaaaaaandddddd. Finallyy.. Our first trial to see the lighting function.


0500 a.m some "touch up" before submission  








Thursday, November 28, 2013

Project 6



6 (a)-Amphitheatre Stage Design


In a group,we need to design a comprehensive studio project that includes the aspects of site analysis,architectural and interior design,structure and material selection,simple costing,project management and construction technique of the scale size building.



This is our team Logo. Our team are known as Heptax !

Key Plan,Location Plan,Site Plan
  and relevant bubble diagrams



The Elevations,Horizontal and Longitudinal Sections,3 Details of structural joints and Perspectives drawings 

 Conceptual Design sketches.Our stage design were based on the Lotus flower. 

In this project,every single major are combined to form the group of 16 members to complete the project.So in this alternative,i can make new friends in the team and form a strong team and help each other to complete the task.

PROJECT 5

5(a)-Neighbourhood Elements: Existing Condition


In this project,we required to do self-visit to the Bayan Residence to observe and gather relevant information about the components and elementsof the neighbourhood area.



5(b)-Neighbourhood Elements : Proposed Improvement


Based on self visit to the choosen neighbourhood area,we shoul propose some suggestions to improve the physical and non-physical conditions of the neighbourhood area by presenting it graphically in the Project 5(b).So,i suggest the improvement at this neighbourhood area by having the Multipurpose Hall,Ramp for the disabilities people,guard house,speed bumper and cycling routes for the additional facilities.

Tuesday, November 26, 2013

PROJECT 4-PRESENTATION DRAWING


Axonometric drawing and one point perspective drawings.



The Medium i used to completed this drawings is Set Square,Pencils,Drawing Pen and Colour Pencils.From this drawings,it give me an experience to know how to draw the blueprint which consist of plan view,left and right view,front and rear view or known as "lukisan kejuruteraan"